ALZA Development

Horizon View / Procurement

November 8, 2026

Materials & supplier quotes

3830 Horizon View Way / 29 trade packages / Preliminary register

Find the specification. Check the quantity. Build a clear supplier quote.

728Material & scope lines
29Trade packages
199Quantity / reference populated
529Awaiting takeoff or design
76Open coordination issues
For supplier pricing · Not released for ordering

This is a preliminary scope and material register. Numeric entries include plan counts and reference quantities; they are not all verified purchase quantities. Exact cuts, runs, accessories and fabricated components require coordinated takeoffs and shop documents. No supplier prices or bids have been entered.

Loading the material register…

01 / FIND & PRICE

The material register.

Search a plan tag, material, model or source sheet.
Expand a line for its specification and required action.

“Quantity pending” is unmeasured, not zero. “Included in parent” prevents duplicate pricing. Every line remains on order hold.

02 / ASSIGN THE SCOPE

29 packages. Clear boundaries.

Each package identifies the lead, supplier type and scope.
Select one to filter the material register above.

03 / READ THE BASIS

Assemblies & quantity references.

Keep the specification and its unresolved details together.
Reference calculations do not add to the material total.

Plan-based assembly notes49 summaries
Quantity basis & checks24 references

04 / RESOLVE BEFORE RELEASE

Close the open details.

A listed quantity does not resolve a drawing conflict.
Review the responsible party, evidence and action.

05 / REQUEST COMPARABLE QUOTES

Put the right scope in the right hands.

Supplier starting points from the workbook.
Availability, suitability and pricing require confirmation.

PREPARE THE REQUEST

Send the package, the drawings and the open issues.

Use the filtered CSV or workbook, attach the current relevant plan sheets, and ask the supplier to return its own itemized bill of materials. Separate materials, installation, tax, freight and exclusions. Keep complete package bids separate from component subtotals to avoid double counting.

Get the RFQ workbook ↓
Supplier response & release requirements10 requirements

Directory reviewed November 8, 2026; window sources checked during the preceding window package. No quotes requested or obtained through this page. The Shamrock listing is older and requires confirmation.

SOURCE DOCUMENTS

Return to the current drawings.

Original plan links open the owner's ChatGPT file and may require access. The downloadable window package includes its supporting plan sheets. This register does not revise the drawings, the construction budget or the value-engineering scenarios.