Foundations & retaining
Ask the structural and geotechnical engineers to test and price a coordinated alternative. No reduced member sizes, quantities, or excavation costs are assumed here.
HORIZON VIEW · VALUE ENGINEERING
Compare targeted allowances, understand scope changes, and identify what needs a contractor bid.
01 / CHOOSE A SCENARIO
Each package is a complete comparison.
Pool alternatives are never stacked.
SELECTED SCENARIO
Modeled project budget
MODELED BUDGET REDUCTION
—Direct cost target reduction—The total reduction includes lower contractor markup and a smaller contingency allowance. It is not a guaranteed construction saving.
02 / FOLLOW THE ARITHMETIC
General conditions stay fixed. Contractor overhead and profit, contingency, and additional design costs are carried through the calculation.
The headline rounds to the nearest dollar. The table shows the complete calculation to the cent.
| Budget component | Baseline | Selected |
|---|
04 / PRICE NEXT
These require coordinated design and pricing.
They are excluded from the calculations above.
Ask the structural and geotechnical engineers to test and price a coordinated alternative. No reduced member sizes, quantities, or excavation costs are assumed here.
Have the architect and structural engineer test simpler spans, aligned supports, and repeated details. Confirm effects on the floor plan before pricing a revision.
Reconcile each deck's support, framing, surface, waterproofing, drainage, and guards. Price a complete assembly before comparing alternatives.
PROTECT THE REQUIRED PERFORMANCE
No savings are credited for reducing engineering, waterproofing, drainage, fire protection, or required energy performance. Any proposed revision must be coordinated with the design team and applicable approvals.
OMISSION IS DIFFERENT FROM PHASING
Deleting a pool from the scope is different from building it later. A deferred pool needs its own future budget, including potential redesign, remobilization, and escalation. Phasing is not counted as a permanent saving here.
BASIS & NEXT DECISION
The linked references support the review process. They are not contractor quotes or validation of the target allowances.