HORIZON VIEW · STRUCTURAL SCOPE REVIEW
Foundation & framing.
See the structure. Check the specified assemblies.
Understand the allowance—and what remains unresolved.
VISUALIZE / SPECIFY / ESTIMATE / CLOSE THE GAPS
Loading structural review…
Use the drawings for dimensions, details and coordinated construction requirements. The model does not establish structural adequacy.
Geometry and source limitations
Select a source sheet to inspect the original drawing.
01 / SPECIFY
What the drawings call for.
Materials, assemblies and details as documented.
Unresolved conflicts stay visible.
| Element | Specified assembly / requirement | Drawing reference | Review status |
|---|
02 / DEFINE THE SCOPE
Carry the complete work package.
Use these boundaries to obtain comparable trade proposals and assign shared work once.
03 / ESTIMATE
Reconcile the planning allowance.
Low / base / high direct costs.
Before project overhead, profit and contingency.
Replace or reconcile existing lines; do not add twice. These are existing analyst planning allowances, not contractor bids. Additional costs for unresolved items are not quantified; some of that work may already be covered by these allowances. Provisional floor areas are not a concrete, reinforcing or lumber takeoff.
| Scope & pricing basis | Quantity / unit | Low | Base | High |
|---|
Existing allowance allocation
Qualifications & ownership
This review does not automatically change the original PDF / Excel estimate, MEP proposal or value-engineering scenarios.
04 / CLOSE THE SCOPE GAPS
What needs a decision or a price.
Missing information, overlaps and deferred work are different issues. A flagged gap is not automatically an extra charge.
DRAWING & ESTIMATE BASIS
Return to the source.
The reviewed drawings, specifications, source references and pricing assumptions are shown together. This page does not revise the engineer’s design, certify compatibility or authorize construction.